Example project

Processing of Primary Scrap at Integrated Steel Plant:

  • Leaching with hot caustic
  • Counter Flow Rinsing
  • Scrap Pre-processing and Post-Processing
  • Zinc recovery with Metallyse Reactor
  • Oil Separation
  • 120000 Ton per year @ 2 Wt% Zn


For the design and realization of the projects Danieli Corus will be involved.


Galvanized Scrap

Cutting containing around 2Wt% zinc either hot dip galvanized or annealed

PRocess Flow

Process Design and sizing of equipment, heat and mass balance followed by basic- and detail engineering

Project

Detailed design for dezincing plant of 120 kTon black scrap per year including electrolytic recovery of the zinc

Interested?

Contact us now at info@metallyse.com or call us on +31 6 4633 1947